News in English

India will require an additional data centre capacity of 1.7-3.6 Gigawatt: Report

India is poised to become a global data center hub due to its low construction, land, and power costs. With a robust IT ecosystem, the country’s data center capacity is projected to reach 3.29 GW by 2028. However, an additional 1.7–3.6 GW will be required to meet rising demand.

Читайте на 123ru.net