News in English

India to set up an additional minimum 80 GW coal based capacity by 2031-32

Ministry of Power stated in a latest update that in order to meet the estimated electricity demand by the year 2031-32, generation planning studies have been carried out by Central Electricity Authority (CEA). As per the study results, it is envisaged that to meet the base load requirement of the country in 2032, the required coal & lignite based installed capacity would be 283 GW against the present installed capacity of 217.5 GW. Considering this, Government of India proposes to set up an additional minimum 80 GW coal based capacity by 2031-32.

Читайте на 123ru.net