News in English

Red Rocket completes Brandvalley wind turbine installations

Renewable energy power producer Red Rocket Energy has installed the 32 main turbines at the Brandvalley Wind Farm. All 32 Vestas V150-4.5MW wind turbines have been installed 17 months after construction started in 2023. This represents a major step towards reaching the commercial operations date, which is expected to be achieved in the fourth quarter.

Читайте на 123ru.net