News in English

Supplier for second interconnector transformer selected following €20m bid

Key machinery required to run electricity through a second undersea interconnector is to be supplied and installed by a local firm, after its €20.3 million tender bid proved to be the cheapest.AG Installations has been recommended as the supplier to install a shunt reactor on each side of the interconnector – in Magħtab and Ragusa,...

Читайте на сайте